Search:

Tag: roughy

Search: Search took 0.00 seconds.

  1. Torsion box bench idea/help grand design

    Started by Simplicity, 3rd September 2013 09:06 PM
    • Replies: 12
    • Views: 2,424
    Last Post: 7th October 2013 10:26 PM
    by Simplicity  Go to last post
  2. Eliza's box with a purpose

    Started by ElizaLeahy, 6th August 2009 12:40 PM
    boss, box, boxes, camphor, caught, coming, cute, der, desk, eliza, fishing, floor, gem, laurel, lid, lip, market, matching, morning, office, possition, purpose, roughy, sits, size, sunday, top, toy, undignified, wiser
    • Replies: 9
    • Views: 1,667
    Last Post: 6th August 2009 05:45 PM
    by Ozkaban  Go to last post
  3. Roughy re-handle and SO bowl

    Started by Robomanic, 4th November 2008 07:57 PM
    2 Pages
    1 2
    1/2, bag, base, bottom, bowl, chute, covering, decided, drying, exposure, filled, hollowed, leave, leaving, lip, lot, lugs, material, mistake, rehandle, rhs, rim, roughy, sand-filled, shavings, slow, stand, thinking, time, waste
    • Replies: 25
    • Views: 2,707
    Last Post: 23rd November 2008 04:50 PM
    by DJ’s Timber  Go to last post
  4. help with timber id

    Started by Brown Dog, 4th January 2007 07:05 PM
    bark, black, bowl, bowls, break, bye1, cheers, chrissy, covered, feet, finished, head, hope, news, ono, pic, picked, pretty, rest, road, rough, roughy, shoes, smell, timber, toe, top, wondering
    • Replies: 8
    • Views: 1,701
    Last Post: 8th January 2007 12:12 AM
    by soundman  Go to last post

    Forum:
    TIMBER

  5. Temperature Switch

    Started by echnidna, 23rd July 2006 11:08 AM
    advice, background, build, current, cutout, dehumidifier, electronics, expertise, jobs, kiln, magazine, overheating, prevent, roughy, specific, supplier, switch, temeperature, temperature, wire, woodworker
    • Replies: 2
    • Views: 1,504
    Last Post: 23rd July 2006 11:31 AM
    by echnidna  Go to last post
Results 1 to 5 of 6